中文幕亚洲精品乱码色偷偷亚_国产午夜性爽视频男人的天堂_欧美高潮流白浆喷水在线观看_亚洲夜色久一久二亚洲琪琪卡一卡二_暖暖亚洲一区二区三区AV无码

China's first tidal power unit connected to grid for one year

Source: Xinhua| 2018-06-01 16:15:41|Editor: Li Xia
Video PlayerClose

HANGZHOU, June 1 (Xinhua) -- China's first tidal power station has been connected to the grid for a year, the longest stable use of the renewable energy, according to the developer.

The 3.4 mega-watt generating unit built by Hangzhou Lin Dong Ocean Energy Technology Co. Ltd. in Zhoushan City, east China's Zhejiang Province, has sent over 800,000 kilowatt hours of electricity to the grid.

Lin Dong, chief engineer and chair of the company, said on Thursday that when all turbines of the generating unit are installed in November, it will have an annual power output of 6 million kilowatt hours, enough for supplying electricity for 3,000 households annually.

The previous record of tidal energy power generation was set in Britain with a four-month supply in 2015.

He said the company is aiming at building a 15 mega-watt or 20 mega-watt power unit that can break even the cost, making the sustainable energy feasible.

Lin is expecting foreign orders, with representatives from Canada and New Zealand interested.

TOP STORIES
EDITOR’S CHOICE
MOST VIEWED
EXPLORE XINHUANET
010020070750000000000000011100001372231461
黑山县| 大庆市| 高雄市| 彰化县| 黄石市| 鄂伦春自治旗| 汽车| 桓仁| 清远市| 辰溪县| 明水县| 东城区| 丹棱县| 瓦房店市| 永清县| 洛川县| 莲花县| 迭部县| 蓬莱市| 中山市| 峨眉山市| 乐平市| 麟游县| 佳木斯市| 闽侯县| 洛南县| 达拉特旗| 始兴县| 财经| 武夷山市| 晴隆县| 山阴县| 蓬莱市| 漳州市| 江永县| 修武县| 武胜县| 洛川县| 冕宁县| 松滋市| 苍南县|