中文幕亚洲精品乱码色偷偷亚_国产午夜性爽视频男人的天堂_欧美高潮流白浆喷水在线观看_亚洲夜色久一久二亚洲琪琪卡一卡二_暖暖亚洲一区二区三区AV无码

First major tunnel over 5,000 meters drilled through along China-Laos railway

Source: Xinhua| 2019-03-21 12:51:40|Editor: xuxin
Video PlayerClose

LAOS-BOTEN-CHINA-RAILWAY-TUNNEL

Photo taken on March 21, 2019 shows the drilling-through ceremony of Boten Tunnel along the China-Laos railway in Boten of Laos. A Chinese railway engineering company on Thursday drilled through Boten Tunnel, the first major tunnel over 5,000 meters along the China-Laos railway. This marks an important milestone in the construction of the project. The Boten Tunnel, with a length of 6453.5 meters, is among the 10 major tunnels longer than five km along the China-Laos Railway. The tunnel has to pass through unfavorable geology such as karst, bedding rock, fault fracture zone, gypsum, carbon mudstone, and water inrush, and it varies, thus creating lots of difficulties to the Chinese engineering company, China Railway No. 5 Engineering Group (CREC-5). (Xinhua/Wang Jingqiang)

BOTEN, Laos, March 21 (Xinhua) -- A Chinese railway engineering company on Thursday drilled through Boten Tunnel, the first major tunnel over 5,000 meters along the China-Laos railway.

This marks an important milestone in the construction of the project. The Boten Tunnel, with a length of 6453.5 meters, is among the 10 major tunnels longer than five km along the China-Laos Railway.

Khamsouk Bounyavong, vice president of Lao People's Revolutionary Party Central Committee's Inspection Committee, and Ju Guojiang, chairman of the Laos-China Railway Co., Ltd, the joint venture in charge of the construction and the operation of the railway, attended the drilling-through ceremony in Boten on Thursday.

The tunnel has to pass through unfavorable geology such as karst, bedding rock, fault fracture zone, gypsum, carbon mudstone, and water inrush, and it varies, thus creating lots of difficulties to the Chinese engineering company, China Railway No. 5 Engineering Group (CREC-5).

The Boten Tunnel was selected to be built as a high-quality demonstration model for the railway project. Since March 2017 when the construction started, the Chinese engineers have strictly implemented the managing requirements of mechanization, industrialization, informatization and profession.

The CREC-5 strengthened the on-site safety and quality control and extensively applied tunnel construction kits, vigorously carried out scientific and technological research, actively promoted the application of new technologies, and paid close attention to process management so as to ensure the safe and orderly advancement of tunnel construction, and lay a solid foundation for the Thursday's victorious breakthrough.

The China-Laos Railway is a strategic docking project between the China-proposed Belt and Road Initiative and Laos' strategy to convert from a landlocked country to a land-linked hub.

The 414.332-km railway runs from Mohan-Boten border gate in northern Laos to the capital of Vientiane within an operating speed of 160 km per hour.

The electrified passenger and cargo railway is built with the full application of Chinese management standards and technical standards

The project started in December 2016 and is scheduled to be completed and opened to traffic in December 2021.

   1 2 3 Next  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001379124501
旬邑县| 昌乐县| 南召县| 阿尔山市| 登封市| 武平县| 青浦区| 屯留县| 堆龙德庆县| 藁城市| 喀什市| 陆丰市| 铁岭市| 江孜县| 东平县| 巴马| 五华县| 两当县| 卫辉市| 达尔| 连城县| 汉中市| 漳浦县| 温宿县| 秭归县| 银川市| 高平市| 金坛市| 临湘市| 南郑县| 墨玉县| 和林格尔县| 郧西县| 靖边县| 平乡县| 奉化市| 梁山县| 邻水| 商都县| 石台县| 娄底市|